Case studies
Location: Telford Industrial Estate
Project: Redesign works for new tenant of Industrial building
Our Work: Design and create new car park and roads around the building for tenants critically high HGV use, including site external drainage. Product used was Tarmac Ultiphalt HD.
Location: Autobase Industrial Estate
Project: Plane existing road and re-tarmac main road
Our Work: Plane existing road and re tarmac 1400m2 of main road through industrial estate.
Location: Cannock Industrial Estate
Project: Resurface industrial estate roads for multiple clients
Works included erection of traffic management, extensive verge clearance through reduced dig, road planing and removal of waste, resurfacing with binder and surface course, reinstating linemarkling. Improve the condition of roads for their heavy HGV traffic flow.
Location: Yardley, Birmingham
Project: 3 Apartment block
Enabling works including demolition and site clearance, Deep drainage, Attenuation and plot drainage, infrastructure including working with statutory undertakers to connect services including electric, data and sewers through section 106 works.
Location: Collins Aerospace, Marston Green
Project: Resurface industrial estate roads for multiple clients
Installation of new permeable open grade granite sub base to meet SUDs and local authority requirements.
Location: New Housing Development, Worcestor
Project: Front end works completed
Liaising with local authority and traffic management to carry out full sewer connection package in the footpath. CSG will return to complete finishing works at the end.