Case studies

dji_fly_20240806_141238_116_1723130688994_photo_optimized.JPG

Location: Tewkesbury Private School 

Project: High spec external works package to a national leading new private school

Industrial

We were appointed to deliver the package for a private school in Tewkesbury. The school had been closed for years and recently undergone heavy investment to bring the school up to date and ready to welcome students in September 2024.

Road Surfacing.jpg
Industrial

Location: Solihull

Project: Car Park & Road Surfacing

An old concrete road over a mile long used by heavy traffic accessing a busy hotel and riding club is severely cracking and deteriorating. We designed and planned an extremely aggressive programme of works to completely resurface the entire road in 24 hours

58c53a3f-928f-4428-9435-2732f2daae64.JPG

Location: New Housing Development, Worcestor

Project: Front end works completed

Housing

Liaising with local authority and traffic management to carry out full sewer connection package in the footpath. CSG will return to complete finishing works at the end. 

Telford Industrial Estate

Location: Telford Industrial Estate 

Project: Redesign works for new tenant of Industrial building

Industrial

Our Work: Design and create new car park and roads around the building for tenants critically high HGV use, including site external drainage. Product used was Tarmac Ultiphalt HD.

Cannock Industrial.jpeg
Industrial

Location: Cannock Industrial Estate 

Project: Resurface industrial estate roads for multiple clients

Works included erection of traffic management, extensive verge clearance through reduced dig, road planing and removal of waste, resurfacing with binder and surface course, reinstating linemarkling. Improve the condition of roads for their heavy HGV traffic flow.

Collins Aerospace.png
Industrial

Location: Collins Aerospace, Marston Green

Project: Resurface industrial estate roads for multiple clients

Installation of new permeable open grade granite sub base to meet SUDs and local authority requirements.

Commercial.png

Location: Autobase Industrial Estate

Project: Plane existing road and re-tarmac main road

Industrial

Our Work: Plane existing road and re tarmac 1400m2 of main road through industrial estate.

Yardley Birmingham
Commercial

Location: Yardley, Birmingham

Project: 3 Apartment block 

Enabling works including demolition and site clearance, Deep drainage, Attenuation and plot drainage, infrastructure including working with statutory undertakers to connect services including electric, data and sewers through section 106 works. 

58c53a3f-928f-4428-9435-2732f2daae64.JPG
Housing

Location: New Housing Development, Worcestor

Project: Front end works completed

Liaising with local authority and traffic management to carry out full sewer connection package in the footpath. CSG will return to complete finishing works at the end. 