Case studies

Location: Tewkesbury Private School
Project: High spec external works package to a national leading new private school

We were appointed to deliver the package for a private school in Tewkesbury. The school had been closed for years and recently undergone heavy investment to bring the school up to date and ready to welcome students in September 2024.


Location: Solihull
Project: Car Park & Road Surfacing
An old concrete road over a mile long used by heavy traffic accessing a busy hotel and riding club is severely cracking and deteriorating. We designed and planned an extremely aggressive programme of works to completely resurface the entire road in 24 hours

Location: New Housing Development, Worcestor
Project: Front end works completed

Liaising with local authority and traffic management to carry out full sewer connection package in the footpath. CSG will return to complete finishing works at the end.

Location: Telford Industrial Estate
Project: Redesign works for new tenant of Industrial building

Our Work: Design and create new car park and roads around the building for tenants critically high HGV use, including site external drainage. Product used was Tarmac Ultiphalt HD.


Location: Cannock Industrial Estate
Project: Resurface industrial estate roads for multiple clients
Works included erection of traffic management, extensive verge clearance through reduced dig, road planing and removal of waste, resurfacing with binder and surface course, reinstating linemarkling. Improve the condition of roads for their heavy HGV traffic flow.


Location: Collins Aerospace, Marston Green
Project: Resurface industrial estate roads for multiple clients
Installation of new permeable open grade granite sub base to meet SUDs and local authority requirements.

Location: Autobase Industrial Estate
Project: Plane existing road and re-tarmac main road

Our Work: Plane existing road and re tarmac 1400m2 of main road through industrial estate.


Location: Yardley, Birmingham
Project: 3 Apartment block
Enabling works including demolition and site clearance, Deep drainage, Attenuation and plot drainage, infrastructure including working with statutory undertakers to connect services including electric, data and sewers through section 106 works.


Location: New Housing Development, Worcestor
Project: Front end works completed
Liaising with local authority and traffic management to carry out full sewer connection package in the footpath. CSG will return to complete finishing works at the end.